Skip to main content
Sri Lanka Tea Board · National B60 Standard

Objective AI Best Leaf % Grading & Tamper-Proof Intake Audits.

Tea B60 connects factory receiving sheds with national regulatory oversight. Field teams capture green leaf samples, compute instant AI B60 fine-leaf scores, and print QR-verifiable supplier slips—backed by an append-only audit ledger across six role levels.

Levels 1 – 3
Factory Business Chain

Field Users (L1), Factory Managers (L2), and Multi-Factory Owners (L3) capture intakes, approve reason-coded corrections, and settle supplier payouts.

Levels 4 – 6
Tea Board Regulator Chain

Area Inspectors (L4), Regional Additional Commissioners (L5), and the National Commissioner (L6) audit immutable records, log findings, and rule on appeals.

National Standard
≥ 60.0%
Two Leaves & Bud Target
Audit Immutability
100% Locked
Append-Only Corrections
Dual-Chain Scope
L1 → L6
Factory + SLTB Linked
Interactive B60 Intake Sandbox

Inspect AI leaf segmentation, L1→L2 override audit, and 80mm thermal slip

SLIP-2026-08841·High Grown · 1,380m
Model Conf: 97.8%
2 Leaves + Bud99.1%
2 Leaves + Bud98.4%
Soft Tender Leaf96.2%
Coarse Mature95.0%
Leaf Composition BreakdownBest Leaf (Fine + Soft): 68.4%
Bud+2: 49.2%
Soft: 19.2%
Coarse: 24.1%
Stem: 7.5%
Active B60 Score
68.4%B60 PASS
Premium B60+ Tier
Net Payable Weight
77.0kg
Gross 84.5kg − 7.5kg ded.
Supplier Payout
LKR19,997
@ LKR 259.70/kg
Append-Only Audit Ledger:Entry v1 · AI Confirmed (0x9f4c...82e1a)

Original AI B60 score is locked in Entry v1. L1 can propose a correction but cannot overwrite v1.

End-to-End Operational Flow

From Factory Intake Shed to National Tea Board Oversight

Every green leaf intake follows a deterministic four-stage workflow that protects smallholder suppliers, factory managers, and Sri Lanka Tea Board inspectors alike.

STEP 01Level 1 · Field User

Sample Capture & Weighing

L1 Field User selects the supplier route, records gross weight & moisture deduction, and snaps an overhead leaf tray photo on the mobile PWA.

Logged to Immutable Ledger
STEP 02AI Vision Adapter

Instant B60 Leaf Grading

Computer vision segments Two Leaves & Bud vs. coarse leaf and stems, calculates the Best Leaf % against the active SLTB standard, and computes payout.

Logged to Immutable Ledger
STEP 03Level 1 & Level 2

L2 Approval & Thermal Slip

L1 confirms the AI result or submits a reason-coded correction for L2 Manager sign-off. A tamper-proof QR receipt prints immediately for the supplier.

Logged to Immutable Ledger
STEP 04Levels 4 – 6 · SLTB

Regulatory Spot-Checks & Appeals

Tea Board Inspectors (L4), Regional Commissioners (L5), and the National Commissioner (L6) audit locked records, log findings, and adjudicate appeals.

Logged to Immutable Ledger
Dual-Chain Access Architecture

Six Role Levels. Two Independent Chains. One Shared Truth.

Every factory is linked to one Owner (Level 3) and one Inspector Area (Level 4). Select any level below to inspect its exact scope, permissions, and governance boundary.

Government accounts (L4–L6) provisioned exclusively by TekLab Platform Admin
Factory Chain (Levels 1 – 3)Capture & Operations
Regulator Chain · SLTB (Levels 4 – 6)Read-Only Audit + Rulings
LEVEL 1Factory Chain (Business)

Field User (Photo Taker)

Account Provisioned By
Level 2 Factory Manager

Operates at the factory receiving shed. Captures green leaf tray photos, records gross weight & moisture deductions, reviews AI Best Leaf % result, and prints thermal supplier receipts.

Primary Responsibilities

  • Capture overhead sample photo via mobile/tablet PWA
  • Confirm AI B60 % or submit reason-coded correction for L2 sign-off
  • Print 80mm QR-verifiable thermal slip for leaf supplier

Enforcement Matrix (Level 1 Capabilities)

Capture Sample
Yes
Correct AI Result
Yes (requires L2 approval)
Manage Users
—
Dashboard Scope
Own intakes only
Supplier Payments
—
Raise Finding
—
View Findings
—
Decide Appeals
—
Set B60 Standard
—
Edit Saved Audit Records:
Locked (Append-only)
Architectural Guarantees

Built for Regulatory Trust & Factory-Floor Speed

Designed around strict data immutability, transparent supplier payouts, and pluggable computer-vision grading.

Append-Only Audit Trail (Zero Destructive Edits)

Neither a Field User (L1), a Factory Owner (L3), nor the National Commissioner (L6) can alter or delete a saved intake record. When an L1 user challenges an AI score, the system writes a linked correction proposal that remains inactive until approved by the L2 Factory Manager—preserving both the raw AI inference and the human override for L4–L6 Tea Board inspectors.

1. Intake v1 (AI 53.8% · Locked)2. L1 Proposal (58.5% + Reason)3. L2 Sign-Off (Entry v2 Active)

Three-Tier Appeal Escalation

Structured dispute resolution protects both smallholders and factories:

  1. 1. First-Level Supplier DisputeL2 Factory Manager
  2. 2. Regional Regulatory EscalationL5 Addl. Commissioner
  3. 3. Binding National DeterminationL6 Commissioner

National B60 Standard Versioning (Level 6)

The Sri Lanka Tea Board Commissioner (L6) configures national B60 target percentages, regional tolerance bands, and grade rate modifiers. Every intake record snapshots the exact b60_standard_version active at the moment of weighing.

Cross-Chain Owner Visibility (Level 3)

Factory Owners (L3) benchmark B60 quality and supplier payouts across all their estates while maintaining direct read-only visibility into Tea Board Inspector findings (L4–L6) raised on their factories—bridging commercial management and regulatory compliance.

Role-Based Workspace Preview

Select a Role Surface to Enter Tea B60

Test the platform from any perspective in the 6-level hierarchy—from factory receiving shed photo capture to national Sri Lanka Tea Board oversight.